|
We provide the following services:
Dam Construction;
Repairs and Sealing;
Dam Maintenance; Spillways;
Construction and Repair of; Concrete
Weirs and Gabions; Plantation De-stumping;
All other Earthworks;
Plant Hire |
|
|
DAM CONSTRUCTION |
|
|
|
We do a detailed survey of
the proposed site and design and
calculate the most economical
wall position according to your
water volume requirements.
There are many options open to
you. A dam wall does not have to
be regimentally straight; it can
be designed to blend in with the
natural surroundings. Islands
and earth jetties can also be
constructed- improving bird life
and enabling good fishing,
especially with trout dams.
We avoid as far as possible
encroaching into wetlands or
removing indigenous trees.
Meticulous attention is given to
smoothing off soil borrow areas
and re-covering them with
topsoil. This enables quick
re-growth of vegetation and
minimal scarring.
You will be advised as to the
procedure for ascertaining
Water- and Environmental
Affairs' permits. |
|
 |
 |
|
Core trench being
backfilled with Dam wall halfway through
clay, preventing seepage under construction
dam wall. |
Core trench in progress
|
|
 |
 |
|
Core
trench completed and dam Dam
wall completed and topsoil
wall construction started. re-spread until full supply level.
|
Completed dam wall to hold 56 ha water
|
DAM REPAIR AND SEALING
Once it is determined where a problem lies, which could
be due to either bad construction methods, incorrect
wall slopes, inadequate spillways, termites, etc.,
various options can be discussed to rectify the problem.
A half hearted repair can ultimately be very costly. |

Cheaply built, expensive to repair |
DAM MAINTENANCE
Termites
(click on photos for
enlargement) |
|
 |
|

Well maintained wall,
no trees, and grass kept short
|
| You will be
advised as to the maintenance of the completed dam which cannot
be over emphasized |
SPILLWAYS (Overflows)
From past experience inadequate attention unfortunately is
given to the spillway with devastating consequences and exorbitant costs. |
 |
 |
GABIONS AND WEIRS |
|
Construction and repair of
concrete gabions and weirs.

Packing gabions
Gabion weir
|
OTHER EARTHWORKS
Any other
earthworks will be undertaken such as:
- terracing - gravel roads - levelling - house sites,
sports fields, etc. - cut and fill |
DE-STUMPING
We use a method
whereby the stumps, e.g. bluegums, are pulled out vertically
with all lateral roots intact and barely any soil adhering to
the roots, making burning easier later on.De-stumping in
this method minimizes the disturbance of topsoil. It is common
practice usually today for a bulldozer to push out stumps which
can cause immense disturbance of the topsoil and tends to leave
roots behind.
Pricing will be
determined depending on type and size of trees.
|
|
3m monster removed
|

stumping completed,
piles
almost free of soil, left for
easier burning
|

extracted with minimal soil
disturbance
|
|

De-stumping. Stumps carted away. |

De-stumping. Stumps dumped with no soil on
roots |

........... and ALL under
personal supervision! |
|
PLANT HIRE
Equipment
can be hired with driver on an hourly basis.
Supervision will be the Client's responsibility.
|
| |
|
|
|